Temporary Access Perth

Perth Major Project comes to an end for AEG

Over the past 2 years Access Engineering Group was engaged as the major temporary Access provider for the Clients major project in Subiaco.

From early 2020 Access Engineering Group was able to provide various types of access solutions to their clients’ major project in Subiaco. These solutions included Scaffold, Mastclimbers and Rope Access. During this time AEG was able to help their client not only reduce the time of the construction phase with their specialized Mastclimber Platforms, they also managed to do this safely and with a large saving to the client.

The project was able to test the vast majority of what AEG has to offer including:

  • Layher System Scaffold as the primary scaffold on hire
  • Specialized Aluminum Beams across the site
  • HEK Mastclimber system that was engineered and pre-assembled prior to arriving on-site and installed by our professional team
  • Pull testing on Anchors fitted on site
  • Formwork Propping
  • Rope Access works

Final Thoughts

During the time on the project, AEG was challenged many times over but AEG always rose to the challenge and helped the client and its subcontractors achieve their goals. AEG is looking forward to many more projects with their Client.

Leave a Comment