16 tonne WLL Engineered Loading Bay
Project Description
AEG was requested by the client to design and install a 16 tonne WLL Loading Bay for Large Panels to be lifted over the projects main entrance.
The support system was Layher Allround, .75m X Beams were used as the primary bridging members at 300mm centres with tube and fitting lacing and bracing the bridge together.
The bridge was craneable and was assembled off-site and craned onto the Layher Shore with the site’s tower crane which reduced the downtime above the site’s main entrance to 15 minutes.